Paulina Update – 9/9/15

The modular has been moved to make way for the new gym and a new ADA ramp and stairs have been constructed to access the modular as well as new sidewalks between the two modulars and the main building. The administrative office has been moved into the main building with new exterior windows and new flooring. Existing restrooms in the main building have been updated and new restrooms are being constructed in part of the old gym and the site is being prepared for the new gym which will be completed by December, 2015.

IMG_3208 - Modular Moved

Modular moved next to main building

 

IMG_3180 - New ADA ramp

New ADA ramp installed to modular

 

IMG_3181 - New sidewalk

New sidewalks

IMG_3185 - New sidewalk

New sidewalks

 

IMG_3160 - New office Lisa McLean

New office area in main building with 2 new windows. Lisa McLean, secretary, getting settled in.

IMG_3161 - New office area

IMG_3174 - New Flooring

New flooring in office area. Same VCT flooring installed in library next door

 

IMG_3154 - New Bathrooms

Walls of new restrooms being built in section of old gym.

IMG_3232 - View from Above School

Site is being prepared for new gym to the right of existing building

 