Paulina Update – 10/28/15

New flooring has been installed in the hallway and the old gym to match the new flooring in the library and part of the office, the new pre-fabricated building for the gym is being erected and two new propane tanks have been installed.

DSC_0271 - Concrete Pad for Gym

Concrete pad for new gym

IMG_1591 - Gym Constr

Pre-fabricated assembly of new gym

IMG_1590 - Propane tanks

New propane tanks installed

IMG_1592 - Playground Moved

Playground area moved

IMG_1585 - New VCT Hall

New flooring in hallway

IMG_1586 - New VCT Old Gym

New flooring in old gym (one of two new windows visible)

DSC_0276 - Kitchen New Flooring

New flooring in kitchen

DSC_0277 - Library New Flooring

New flooring in library

DSC_0278 - Office & Conf Room

Office and conference area

DSC_0279 - Office