Pioneer South – Exterior Work Completed July 2017

The exterior of the building has a new entry with ADA ramp, improvements to loading dock, stairways repaired or replaced, new exterior sunscreens installed, stucco repairs and painting of the building.  Below are some “before” and “after” pictures.

Pioneer Entry

Before

 

Pioneer Entry

After

 

Pioneer Entry Long SHot

Before

 

Pioneer Painting

After

Comments are closed.

Flickr Photos