Pioneer South – Exterior Work Completed July 2017

The exterior of the building has a new entry with ADA ramp, improvements to loading dock, stairways repaired or replaced, new exterior sunscreens installed, stucco repairs and painting of the building.  Below are some “before” and “after” pictures. Before   After   Before   After

img_4545-computer-lab

Pioneer South Open House – April 10, 2017

With the interior of the new Pioneer South building now complete and everyone moved in during Spring Break, a celebratory Open House was held on April 10th just prior to the district Board Meeting.  This building located on First Street, which formerly housed kindergarten through third grade students as part of the old Crooked River […]

img_4452-it-dept

Pioneer South Open House – April 10, 2017

With the interior of the new Pioneer South building now complete and everyone moved in during Spring Break, a celebratory Open House was held on April 10th just prior to the district Board Meeting.  This building located on First Street, which formerly housed kindergarten through third grade students as part of the old Crooked River Elementary, […]

img_4433-copy

Pioneer South/First Street Remodel – November 30, 2016

This project is well underway.  New flooring will be installed throughout the building including new plywood underlayment.  The front entry will have new exterior stairs and an ADA ramp as well as a security vestibule similar to the other schools in town. The old library will become space for the IT department   The district […]

IMG_3453 - Copy

Crooked River First Street Remodel – February 12, 2016

The District is currently in the planning phase to convert the First Street section of the Crooked River Elementary School to house Technology, a central Production Kitchen, Pioneer Alternative High School and several overflow elementary classrooms. After students finish the school year in June 2016, the First Street building remodeling can begin. In September 2016, […]