Paulina Update – February 5, 2016

The new gym and restrooms are now complete except for a few minor punch list items. A new gym was constructed from a pre-fabricated metal building and includes 2 basketball hoops, a volleyball net, protective pads below each hoop, and storage for gym equipment. The floor is a multi-purpose athletic surface that looks like real […]

Paulina Gym Update – December 2015

The new gym exterior is now fully enclosed. This work has been delayed due to inclement weather and is now expected to be ready for use no later than February 1, 2016. Exterior of new gym Roof installation Interior of gym after roof installed. Temporary construction lighting is being used until the light fixtures are […]

Paulina Update – 10/28/15

New flooring has been installed in the hallway and the old gym to match the new flooring in the library and part of the office, the new pre-fabricated building for the gym is being erected and two new propane tanks have been installed. Concrete pad for new gym Pre-fabricated assembly of new gym New propane […]

Paulina Update – 9/9/15

The modular has been moved to make way for the new gym and a new ADA ramp and stairs have been constructed to access the modular as well as new sidewalks between the two modulars and the main building. The administrative office has been moved into the main building with new exterior windows and new […]

Paulina Update – August 4, 2015

Asbestos has been removed from the main building which includes the classrooms, hallways, kitchen and gym.   The modular has been moved and placed next to the main building to make room for the new gym. All parking will be moved to the street side of the building. A temporary wall has been placed in […]

Paulina Update – July 27, 2015

Asbestos flooring has all been removed from the main building. Here are pictures of the old cafeteria, media room and gym. After the remodel, the old cafeteria will become the media room, the old media room will become the office space and the old gym will become the cafeteria and multi-purpose room. The modular has […]

Paulina Update – 1/30/15

Griffin Construction was selected as the CM/GC (Construction Manager/General Contractor) for this remodeling project on January 27, 2015. We will work closely with Griffin, the staff at Paulina and the project management team to plan this project in detail. Plans for this remodel are being developed.  